Post Subject: End of the project planPosted by Romy the Cat on: 9/7/2010
fiogf49gjkf0d

I think my carpenter got another job as he is kind of working lastly 3-4 hours per day. I would like to finish the project ASAP therefore I have built a simple project plan and the following check points:

Sunday, August 12

Construction is finished. All primary and secondary elements are glued. Horns are sanded and primed. Back chambers are built. Horns are lifted to listening room and positioned for final assembly.

Friday, August 16

Horns are assembled. Final finish appalled. The back chambers are tune to the 42Hz. The lifting up mechanism is devised and horns are positioned to be lifted. The attic aria is prepared and cleaned up to accept the horns. The center poll beam is installed.

Saturday, Sunday August 18, 19

The horns are lifted up to the default position in the attic.

Friday, August 24

The horns are attached to the house frame. The attic support beams are installed. The horn supporting framed are built and installed. The horns are connected and tested at max pressure. The resonating framing joins are identified and taken care of. The drywall around the horns mouth and around the center poll beam re-built. The wall plaster is applied and sanded.

Thursday, August 30

The horns are spot-re-painted where necessary. The walls are painted. The final touch up and cleans up. End of the project.

The Cat